Being an owner builder costs whatever your trades, materials, approvals and insurance add up to, minus the builder’s margin you no longer pay, plus the value of the time you spend running the job. There is no honest fixed percentage: the saving depends on how much you manage and do yourself, how well you schedule trades and how much your time is worth. This guide shows how to work out your own number, line by line, with the costs the law makes you pay and the ones people forget.

The Owner Builder Savings Myth vs Reality

Headline figures such as “save 30%” or “save $100,000” are averages from projects that are not yours. Two owner builders building the same design can end up far apart because one does the painting, tiling and landscaping and the other contracts everything out, or because one has a trade background and the other is learning on the job. The only reliable comparison is your own: a line-by-line owner builder budget against a builder’s fixed-price quote for the same design, same site and same inclusions.

What You Actually Save

When you build as an owner builder you take on the builder’s role, so you stop paying for what the builder supplied. In a builder’s quote that usually sits in three places:

Part of a builder’s priceWhat it pays forWhat replaces it as an owner builder
Builder marginProfit, overheads, the builder’s licence, insurance and riskYou carry the risk and the legal duties of the builder
Project managementScheduling trades, ordering materials, site supervision, inspectionsYour time, usually for the whole build
Trade and material markupsMark-ups on subcontractor quotes and suppliesDirect quotes, without the builder’s volume pricing

Ask any builder who quotes your design to show the margin and supervision lines; that is the most realistic picture of the money you can keep.

Realistic Cost Breakdown

Every owner builder budget has the same cost lines. Get a written quote or a published price for each one before you commit, and list exactly what each quote includes so nothing falls between two trades.

Cost lineWho prices itNotes
Steel frame kitKit supplierA BRIbuild kit is structure only: steel subfloor, wall frames, roof trusses and engineering. See published prices on Kit Home Floor Plans; delivery is quoted to your site
Drafting, engineering, soil test, energy ratingDrafter, engineer, geotechnical tester, energy assessorSite-specific; the soil test decides the footing design
Planning and building permitsCouncil, building surveyor or certifierFees set by each council and surveyor
Owner builder permit or certificateState regulatorApplication fee set by the state; see owner builder permits by state
Footings or slab, site cut, drainageConcreter, excavatorDepends on slope, soil class and access
Roofing, cladding, windows, external doorsYour suppliers and installersNot part of a structure-only kit
Plumbing, drainage, electrical, gasLicensed trades (required by law)Rough-in and fit-off are often quoted separately
Insulation, linings, flooring, kitchen, bathroom, paintingTrades or youWhere most DIY savings are made
Services connection, driveway, landscapingUtilities and contractorsLong service runs on rural blocks cost more
InsuranceInsurerContract works and public liability for the build period
ContingencyYouA set share of the budget held back for variations and rework

Hidden Costs Many Owner Builders Miss

Your time

Running a build is a part-time job for the whole project: booking and sequencing trades, ordering materials, meeting inspectors and fixing problems. Put a value on those hours, or on the paid work or leave you give up, and include it in your comparison. Our guide to how long an owner build takes helps you estimate it.

Mistakes and rework

Wrong orders, trades arriving out of sequence and work that fails an inspection all cost money. Hold a contingency and keep it for genuine surprises, not upgrades.

Delays and holding costs

Each extra month adds rent or mortgage on the place you live in now, interest on the construction loan and possible price rises on materials not yet ordered. A realistic timetable agreed with your trades is the cheapest insurance against this.

Insurance

You need cover for the works and public liability while you build, and some states attach insurance rules to selling within a set period. In WA, for example, an owner builder who sells within seven years must take out home indemnity insurance when the work was valued at more than $20,000 (WA Building Commissioner). See our owner builder insurance guide.

Finance

Owner builder construction loans usually come with stricter conditions than a loan for a builder-managed job, such as a larger deposit, written quotes for each stage and progress inspections before each draw-down. Read owner builder finance before you choose a design.

Where to Maximise Savings

Work you can usually do yourself

  • Project management and coordination of trades
  • Painting, with proper preparation
  • Landscaping and fencing
  • Simple carpentry such as shelving and trim
  • Site cleaning during and after construction

Work to leave to licensed trades

  • Electrical, plumbing, drainage and gas fitting (licensed by law in every state)
  • Waterproofing, which is a licensed trade in some states
  • Structural work that must be certified, unless you are competent and your building surveyor accepts it

Why Steel Frame Kits Make Financial Sense

A steel frame kit makes the structure one known line in your budget: the frames and trusses arrive engineered and pre-cut, so there is no on-site cutting or waste, and the engineering documents go into your building permit application. Steel is not food for termites and does not warp or shrink, and the frame must still be designed for your site’s wind class (AS 4055) and, in bushfire areas, its BAL (AS 3959). Compare the two materials in our steel vs timber frame guide for owner builders.

State-by-State Permit Costs

The permit itself is a small part of the budget; what matters is whether you need one and what it obliges you to do. Thresholds for 2026, from each state regulator:

StateOwner builder approval needed forRegulator
VICDomestic building work over $20,000 (certificate of consent)Building and Plumbing Commission
NSWWork over $10,000 that needs a DA or CDCNSW Fair Trading
QLDWork over $11,000 incl. GSTQBCC
WAWork needing a building permit over $20,000 ($50,000 for Class 10a sheds, carports and garages from 1 July 2026)Building and Energy
NTPrescribed residential work over $25,000Building Practitioners Board
ACTOwner builder licence whatever the valueACT Planning
TASPermit per project by risk categoryCBOS
SANo owner builder permit (development approval only)Council or private certifier

Links to each regulator, course rules and repeat limits are on our owner builder permit guide.

Is Owner Building Right for You?

Owner building tends to pay off if you:

  • Have regular time available for the whole build, including weekdays for inspections and deliveries
  • Are comfortable booking, managing and paying several contractors
  • Can keep to a budget and hold a contingency
  • Have some building knowledge or are willing to learn
  • Are building to live in rather than to sell soon after

Work through our owner builder checklist before you apply for a permit.

Owner builder costs FAQ

How much cheaper is it to be an owner builder?

There is no fixed figure. The saving is the builder’s margin, supervision and mark-ups you no longer pay, less the cost of your time, mistakes and delays. Compare a line-by-line owner builder budget with a builder’s fixed-price quote for the same design.

What does a steel frame kit cost?

A BRIbuild kit is structure only (steel subfloor, wall frames, roof trusses and engineering), and published kit prices are listed design by design on Kit Home Floor Plans. Delivery is quoted to your site; everything else in the budget is priced by your own trades and suppliers.

Do I need an owner builder permit in every state?

No. VIC, NSW, QLD, WA and the NT set a dollar threshold, the ACT licenses owner builders whatever the value, Tasmania issues a permit per project, and South Australia has no owner builder permit at all.

What costs do owner builders most often forget?

Their own time, holding costs during delays (rent, loan interest), rework after failed inspections, insurance for the build period, service connections on rural blocks and the contingency itself.

Can I do my own electrical or plumbing work?

No. Electrical, plumbing, drainage and gas fitting must be done by licensed trades in every state, even on an owner builder project, and they issue the compliance certificates you need at the end.

Get Started

Ready to explore owner building with a steel frame kit home? Contact us for a detailed quote based on your design and location. We supply structure-only steel frame kits Australia wide, with delivery quoted to your site.