Owner Builder Perth – Complete Guide

To owner build in Perth you need owner-builder approval from the WA Government when the work needs a building permit and is valued over $20,000, then a building permit from your local government. You must own the land, be an individual, intend to live in or use the home, hold a white card and have done WA owner-builder training in the last 24 months; after approval you wait six years before applying again.

This guide sets out the Perth approval steps, your obligations if you sell, the site issues that drive cost here (sand and clay, the Hills bushfire areas, coastal wind) and what a steel frame kit covers.

Owner Builder Requirements in Perth

RequirementWhat it means in WA
When approval is neededA building permit is required and the work is valued over $20,000 ($50,000 for Class 10a sheds, carports and garages). Jobs cannot be split to stay under the threshold
Who can applyAn individual (not a company or trust) on the title, with no immediate plan to rent or sell
KnowledgeA white or blue construction induction card, plus WA owner-builder training within the previous 24 months (or a WA building, architect, surveyor or engineer registration)
Six-year ruleAfter a permit is granted to an owner-builder, you wait six years before applying again, unless a waiver applies
Selling within seven yearsYou are responsible for the work for at least seven years; selling inside that period needs home indemnity insurance for later owners
TimingApproval typically takes 6 to 8 weeks; you then have six months to apply for the building permit

Source: the WA Government owner-builder approval page. Approval is granted by the Department of Local Government, Industry Regulation and Safety, and the building permit then comes from your local government.

Building Permits and Codes in Perth

A new home needs a building permit from the local government. You can lodge a certified application, with a certificate of design compliance from a private building surveyor, or an uncertified application that the council’s building surveyor assesses. Planning (development) approval is only needed where the local planning scheme, the R-Codes or the bushfire rules call for it.

WA adopted NCC 2025 on 1 May 2026, and NCC 2022 is still accepted until 1 May 2027 (see the ABCB adoption table). We assist you with drafting, council planning and DA, and building permits. Our WA owner builder guide covers the state rules in more depth.

Perth Building Considerations

Sand, clay and slope

Much of the Swan Coastal Plain is sand, while the Hills and parts of the eastern suburbs have clay, rock and slope. A soil report and site classification under AS 2870 set the footing design. An engineered steel subfloor on piers is one way to deal with a sloping Hills block without heavy cut and fill.

Bushfire in the Perth Hills

Land shown on the WA Map of Bush Fire Prone Areas needs a BAL assessment with the building permit, and BAL-40 or BAL-FZ sites need development approval under the State bushfire planning policy (see the WA Government planning for bushfire page).

AS 3959 sets the construction for each Bushfire Attack Level, from BAL-LOW to BAL-FZ. The steel frame is non-combustible and suits every level; the cladding, roofing, glazing, decks and subfloor enclosure change with the BAL, and your BAL assessment and building surveyor confirm what the site needs.

Wind

Perth is in non-cyclonic wind Region A under AS/NZS 1170.2, with higher site classifications on exposed coastal and ridge sites. The Pilbara and Kimberley coasts are cyclonic, so regional WA builds are engineered to the region and site.

Termites

Termites are active across Perth. Steel frames are not susceptible to termite attack, but the NCC still requires termite management for timber or other susceptible parts such as decks and stairs.

Granny Flats in Perth

Since April 2024 an ancillary dwelling up to 70 m2 internal floor area needs no development approval when it meets the R-Codes deemed-to-comply provisions, on a lot of any size, and anyone can live in it (see the WA Government granny flat info sheet). Bushfire prone land and heritage or other local rules can still trigger approval, and a building permit is always needed. The Jamieson (25 m2) and The Marysville (60 m2) sit under 70 m2.

What a Steel Frame Kit Covers

Published steel frame kit prices on Kit Home Floor Plans start at $35,000 + GST for The Jamieson (25 m2) and include The Marysville (60 m2) at $65,000 + GST, The Harcourt (2 bedrooms, 80 m2) at $79,500 + GST and The Dinner Plain (180 m2) at $145,000 + GST. Kits are structure only and freight is quoted to your site.

In the BRIbuild kit (structure only)Organised by you as owner builder
TRUECORE steel subfloorSite works, footings or slab, and service connections
Wall framesRoofing, external cladding and insulation
Roof trussesWindows and external doors
Engineering for your site (wind, soil, BAL)Linings, flooring, kitchen, bathroom and licensed trades

Steel frames and roof trusses are not susceptible to termite attack and will not rot or warp, although the NCC still requires termite management for timber or other susceptible parts such as decks and stairs. TRUECORE steel carries BlueScope’s steel warranty on BlueScope’s terms; it is a warranty on the steel, not a structural guarantee for the building. The pre-punched, numbered components bolt together with standard tools, which suits owner builders managing their own trades.

Delivery to Perth and Regional WA

Kits are supplied to Perth, the South West and regional WA through our national supply network, and freight is quoted with your kit based on the address and site access.

Perth Owner Builder FAQ

Do I need owner-builder approval in Perth?

Yes, when the work needs a building permit and is valued over $20,000 ($50,000 for Class 10a sheds and garages). You then apply to your local government for the building permit.

What training do WA owner builders need?

A white or blue construction induction card plus WA owner-builder training completed within the previous 24 months, unless you hold a relevant WA building, architect, surveyor or engineer registration.

Can I sell an owner-built home in WA?

Yes, but you are responsible for the work for at least seven years. If you sell within seven years of the permit, you need home indemnity insurance covering later owners for the rest of that period.

Can I build a granny flat in Perth without development approval?

Often, yes. An ancillary dwelling up to 70 m2 that meets the R-Codes deemed-to-comply provisions needs no development approval, unless bushfire or local rules apply. A building permit is still needed.

How much does a steel frame kit cost?

Published kits start at $35,000 + GST for The Jamieson (25 m2) and run to $145,000 + GST for The Dinner Plain (180 m2). Kits are structure only; freight is quoted.

Kit Home Designs for Perth Owner Builders

Browse the current range on Kit Home Floor Plans, or read the Perth kit homes guide for local planning detail and the granny flat size limits by state for state-wide rules. Our state owner builder guide covers the licence or permit steps in more depth.

Talk to Us About Your Perth Project

Send your block address and the design you like, and we will come back with a quoted kit price and freight. Call 1300 866 131 or use the form below.

Thanks! We'll be in touch soon.