In Tasmania you need an owner builder permit from Consumer, Building and Occupational Services (CBOS) before you build or extend your own home, and you need a building surveyor, an approved Tasmanian owner builder course completed in the last 12 months, a white card and public liability insurance of at least $5 million. Owner builders can complete only two Class 1a projects in a ten-year period. This page sets out the Tasmanian rules as published by CBOS and Service Tasmania. To compare Tasmania with the other states, see the owner builder permit guide for each state.
For kit home designs, prices and approvals in Tasmania, see kit homes Tasmania.
Tasmanian owner builder rules at a glance
| Rule | Tasmania |
|---|---|
| Who issues the permit | CBOS, applied for through Service Tasmania |
| What it covers | Residential work only: a detached dwelling or conjoined unit (Class 1a), plus Class 10a/10b and 8 projects on a residence |
| Course | Approved Tasmanian owner builder course in the last 12 months, when building or extending a residence |
| White card | Required, with proof in your application |
| Insurance | Certificate of currency for public liability insurance of at least $5 million |
| Building surveyor | Required: a signed declaration from your building surveyor goes with the application |
| How often | Two Class 1a projects in a ten-year period; each project needs its own permit |
| Permit fee | Per project, set by Service Tasmania (Class 1a $458.40 at the time of writing) |
Sources: Service Tasmania, apply for an owner builder permit; CBOS, owner builder restrictions.
When do you need an owner builder permit in Tasmania?
You need one for owner builder work on a residence. Low-risk work by an owner does not need a permit, and some small work needs no owner builder registration, such as a shed, garage or carport up to 18 square metres (36 square metres if prefabricated), a porch or veranda up to 9 square metres, a deck up to 1 metre high, and maintenance or repairs with similar materials. Permit or notifiable work on a residence still needs a building permit: your building surveyor can advise.
Course, white card and insurance
If you are building or extending a residence you must have completed an approved Tasmanian owner builder course in the last 12 months. You also need a white card (construction induction) and a certificate of currency for public liability insurance of at least $5 million. CBOS says the fee and insurance requirements are the same as for a licensed builder.
Who can apply
You do not have to live in Tasmania or live in the finished home. A person who has signed a contract to buy the land or building counts as an owner. Licensed builders can also apply. Commercial buildings are excluded.
Building permits and the NCC in Tasmania
The owner builder permit lets you act as the builder; your building surveyor issues or arranges the building permit under the Building Act 2016, and planning and plumbing permits may also apply. Tasmania has been on NCC 2025 since 1 May 2026 (ABCB).
Steel frame kits for Tasmanian owner builders
A BRIbuild kit is the structure only: steel subfloor, wall frames, roof trusses and engineering. You organise the slab or footings, roofing, cladding, windows, doors and fit-out with your own trades. We assist you with drafting, council planning and DA, and building permits.
Tasmanian owner builder FAQs
How many owner builder projects can I do in Tasmania?
Two Class 1a projects in a ten-year period, and each new project needs its own permit.
Do I need a course to be an owner builder in Tasmania?
Yes, if you are building or extending a residence: an approved Tasmanian owner builder course completed in the last 12 months, plus a white card.
Do I have to live in Tasmania to get an owner builder permit?
No. CBOS says applicants can live outside Tasmania and do not have to live in the residence.
Useful links for Tasmanian owner builders
Planning an owner builder project in Tasmania? Contact our team or call 1300 866 131.