In Victoria you need a certificate of consent from the Building and Plumbing Commission (BPC) to be an owner builder when the domestic building work is worth more than $20,000, including labour and materials. The BPC replaced the Victorian Building Authority (VBA) as the regulator. You also need a building permit from a registered building surveyor, and if you sell within six and a half years you need a defects report and insurance before you sign the contract of sale. This guide covers each step, using the BPC’s own pages.

Do You Need an Owner Builder Certificate in Victoria?

You need a certificate of consent if the value of the domestic building work is over $20,000. The value is the estimated cost as if you engaged a registered builder, including labour and materials. For a kit home this includes assembling the kit and the site preparation and structural work around it. You do not need a certificate of consent if the total cost is $20,000 or less, if the work is not domestic building work, or if a registered building practitioner is engaged and named on the building permit as responsible for the work. Source: BPC: what is an owner-builder.

Victorian Owner Builder Requirements

Under the BPC eligibility rules you must own the land and live in, or intend to live in, the home. You must pass the owner-builder eLearning assessment and complete construction induction training for the project. The BPC cannot issue consent if you have been issued a building permit as an owner builder for a different property in the previous five years (a small second dwelling is an exception), or if you have previously sold an owner-built home without the required insurance.

Owner Builder Course Victoria

Victoria uses the BPC’s owner-builder eLearning assessment rather than a classroom course. It covers your legal obligations, safety on site, engaging trades, insurance and the permit and inspection process. You also need construction induction training (a white card) before you work on site.

Applying for Your Certificate of Consent

You apply to the BPC with proof that you own the land, your eLearning result and the details of the work. Apply through the BPC’s certificate of consent page, which lists the current fee and processing information. Your building surveyor needs the certificate before issuing a building permit for owner-builder work over $20,000.

Your Responsibilities as an Owner Builder

As the owner builder you are responsible for the work meeting the building permit and the National Construction Code, for site safety and for fixing defects or non-compliances for a subsequent owner for 10 years after the work is completed. Licensed or registered trades must still do the plumbing and electrical work.

Insurance Requirements for Victorian Owner Builders

You do not need domestic building insurance to build as an owner builder, but you do need it, or the newer owner-builder home warranty cover, before you sell within six and a half years. During the build, construction (contract works) insurance and public liability insurance are sensible protection, and workers compensation rules can apply if you employ people directly. Check the BPC’s building insurance page for current options.

Building Permits in Victoria

Separate from your certificate of consent, you need a building permit, issued by a registered private building surveyor or the council’s municipal building surveyor. The surveyor carries out the mandatory inspections during construction and issues the occupancy permit or certificate of final inspection at the end. Victoria applies NCC 2025 to projects whose design started after 1 May 2026 (ABCB adoption table).

Selling Property Built as Owner Builder

If you sell within six and a half years of the occupancy permit or certificate of final inspection, and the work was worth over $20,000, you must get a detailed defects report and buy the required insurance before you enter into a contract of sale, and set out the warranties in the contract. If you don’t, the buyer may be able to treat the sale as voidable. See the BPC’s selling an owner-built home page.

Owner Building a Kit Home in Victoria

A steel frame kit is a common Victorian owner-builder project because the structure arrives engineered for your site. BRIbuild supplies the kit (structure only: steel subfloor where used, wall frames, roof trusses and engineering) and assists you with drafting, council planning and DA, and building permits. Browse Victorian-suited designs on Kit Home Floor Plans. To compare Victoria with other states, see our owner builder permit thresholds by state.

Useful Links for Victorian Owner Builders

FAQs: owner builder Victoria

What is the owner builder limit in Victoria?

You need a certificate of consent from the Building and Plumbing Commission when the domestic building work is worth more than $20,000, including labour and materials.

Is the VBA still the regulator for owner builders?

No. The Building and Plumbing Commission replaced the Victorian Building Authority, and certificates of consent are now issued by the BPC.

How often can I be an owner builder in Victoria?

The BPC cannot issue a certificate of consent if you were issued an owner-builder building permit for a different property in the previous five years, unless the earlier work was a small second dwelling or an exemption applies.

What happens if I sell my owner-built home in Victoria?

If you sell within six and a half years and the work was worth over $20,000, you need a detailed defects report and the required insurance before you sign the contract of sale.

Need help with your Victorian owner builder project? Contact our team for guidance on BPC requirements and the permit process.

Need Help With Your Owner Builder Project?

Our team is here to help you navigate the owner builder process. Get expert guidance today!

Contact Us 1300 866 131